First Wind opens 14 MW Massachusetts solar power project

Sponsored by

Renewable energy company First Wind celebrated the end of construction of the Warren Solar project and announced that commercial operations have begun.

The 14 MW AC Worcester County-based project joins First Wind’s 3 MW AC Millbury, Massachusetts solar power project in commercial operations.

Located at three sites in the town of Warren, Massachusetts, construction began in the fall of 2013 after a long-term power purchase agreement was finalized with the University of Massachusetts (UMass).

As part of the PPA, the UMass Lowell campus and UMass Medical School in Worcester will receive a portion of the financial benefit resulting from the Warren projects. UMass Lowell and UMass Medical School are expected to avoid an estimated $410,000 and $670,000 in utility costs per annum, respectively over the course of the 30-year agreement.

Borrego Solar Systems Inc. led construction of both the Warren and Millbury the projects, which created roughly 85 construction-related jobs. Both projects represent an investment in the surrounding communities and local economies, along with millions of dollars in construction, materials and development costs.

The Warren and Millbury projects are the first solar projects that are part of the First Wind Solar Group, which was formed to explore potential development opportunities across the company’s current footprint in the Northeast, the West and Hawaii. In addition, First Wind Solar Group is also developing a 20 MW AC solar power project in Mililani, Hawaii, as well as 340 MW AC across multiple project sites in Utah through PPAs with Rocky Mountain Power, a division of PacifiCorp.

Sponsored by

Get All the Utility Products News Delivered to Your Inbox

Subscribe to Utility Products or email newsletter today at no cost and receive the latest news and information.

 Subscribe Now


October 2015
Volume 19, Issue 9

Utility Products Topics

Transmission & Distribution
                       Vehicles & Accessories
Tools & Supplies   Safety
Line Construction & Maintenance   Test & Measurement

How to deploy mobile forms + devices to speed up field service processes & reporting

Overcoming the pain points associated with any process is much simpler and more cost effective than you think. This webinar will detail the benefits of switching to mobile forms for field data collection and reporting.
We'll examine real use cases and ROI of integrating mobile forms within a given field service process, including for work orders, inspections, checklists and proposals.
A quick AT&T Mobile Forms demo will reveal the feature rich, user-friendly nature of the solution. You'll see why it’s a must-deploy to speed up data collection, eliminate invoicing/data entry lags and auto-generate/deliver insightful reports.



Industry Company Pages

Keep up-to-date with the latest news and articles from some of the prominent utility product companies and resources.


Everlast Substation signs

Everlast safety signs and Everlast Substation signs meet all ANSI and OSHA requirements and continue to be readable for the life of the substation. When most signs fail ours shine.

Everlast pole tags

Everlast pole tags for distribution poles have been used all over the world in this great earth's worst environment's proving it is the longest lasting product to use on pole's!

Swage Bus Accessories

Swage Bus Accessories use a compression technology process called "swaging" that enables installation of aluminum bus accessories without the need of a welder.