Southern Co. aims to build more nuclear reactors

Sponsored by

Southern Co. said it hopes to announce plans for more new nuclear reactors.

Southern Co. CEO Tom Fanning reportedly made the comments at a conference in Washington, according to Reuters. Fanning said the company is evaluating six possible sites for more reactors, including existing power plants and greenfield locations.

Southern is currently building two Westinghouse AP1000 reactors at its Plant Vogtle in Georgia. The reactors cost about $14 billion, but delays have increased the price tag. Unit 3 is expected to begin operations in late 2017 or early 2018, and Unit 4 is expected to come online shortly thereafter.

Sponsored by

Most Popular Articles


CURRENT MAGAZINE ISSUE

September 2014
Volume 18, Issue 8
file

Utility Products Topics

Transmission & Distribution
                       Vehicles & Accessories
Tools & Supplies   Safety
Line Construction & Maintenance   Test & Measurement

WEBCASTS

There is no current content available.

UTILITY PRODUCTS BUYERS' GUIDE

POWER INDUSTRY JOBS

Industry Company Pages

Keep up-to-date with the latest news and articles from some of the prominent utility product companies and resources.

BUYER'S GUIDE PRODUCTS

Meter Socket Jumpers - Perfect for Submetering Applications

AEP’s Meter Socket Jumper offers a safe and easy means of bypassing a meter socket. The Socket Jumper can be used with either Ringless or Ring style Meters.

Meter Socket Converter

AE Product’s Meter Socket Converter (CNV) converts various Meter Forms to fit the desired application. 14S, 15S or 16S Socket to accept 2S Meter. Optional features available.

Service Disconnect Adapter with Electronic Meter Energizing

AEP’s Service Disconnect Adapter disconnects customer load but maintains power to the electronic meter. The meter maintains reading and communications links for AMR/AMI operations while only disabling the load side.