SunPower expects to own and operate the solar power plant during construction.

Sponsored by

SunPower Corp. began construction on the 135 MW Quinto Solar Project in Merced County, Calif. The system will generate power for Southern California Edison's customers, under a long-term power purchase agreement.

SunPower expects to own and operate the solar power plant.

Including the Quinto power plant, SunPower has more than 500 MWs of residential, commercial and utility solar assets under contract around the world that it may choose to own for a period of time before a strategic sale or continue ownership post-construction during the operational phase of the project.

Under this strategy, SunPower expects to improve project margins and drive higher shareholder returns by capturing the material benefit of its lower system degradation rates, long term project life as well as benefitting from distributions from the project as an equity owner.

SunPower anticipates that about 295 jobs will be created during peak construction of the project, with about $80 million in local economic impact. The company estimates that more than $5 million of tax revenues will also be generated as a result of the project. After completion, which is scheduled for late 2015, the Quinto project is expected to generate enough electricity for 40,000 homes.

SunPower is constructing a SunPower Oasis Power Plant system at the about 1,000- acre site. Oasis is a fully-integrated, modular solar power block that is engineered to rapidly and cost-effectively deploy utility-scale solar projects while optimizing land use.

According to estimates provided by the U.S. Environmental Protection Agency, the completed plant will offset the annual production of almost 134,000 tons of carbon dioxide emissions, which is the equivalent of removing more than half a million cars from California's roads over the next 20 years.

The capacity of the Quinto project discussed in this release is described in approximate MWs on a direct current (DC) basis.

Sponsored by

Get All the Utility Products News Delivered to Your Inbox

Subscribe to Utility Products or email newsletter today at no cost and receive the latest news and information.

 Subscribe Now


October 2015
Volume 19, Issue 9

Utility Products Topics

Transmission & Distribution
                       Vehicles & Accessories
Tools & Supplies   Safety
Line Construction & Maintenance   Test & Measurement

How to deploy mobile forms + devices to speed up field service processes & reporting

Overcoming the pain points associated with any process is much simpler and more cost effective than you think. This webinar will detail the benefits of switching to mobile forms for field data collection and reporting.
We'll examine real use cases and ROI of integrating mobile forms within a given field service process, including for work orders, inspections, checklists and proposals.
A quick AT&T Mobile Forms demo will reveal the feature rich, user-friendly nature of the solution. You'll see why it’s a must-deploy to speed up data collection, eliminate invoicing/data entry lags and auto-generate/deliver insightful reports.



Industry Company Pages

Keep up-to-date with the latest news and articles from some of the prominent utility product companies and resources.


Everlast Substation signs

Everlast safety signs and Everlast Substation signs meet all ANSI and OSHA requirements and continue to be readable for the life of the substation. When most signs fail ours shine.

Everlast pole tags

Everlast pole tags for distribution poles have been used all over the world in this great earth's worst environment's proving it is the longest lasting product to use on pole's!

Swage Bus Accessories

Swage Bus Accessories use a compression technology process called "swaging" that enables installation of aluminum bus accessories without the need of a welder.