Alstom to supply 19 wind turbines for CPFL Renovaveis in Brazil

The wind turbines will be ready for the commercial operation in December of 2017

Content Dam Pennenergy Online Articles 2014 05 Alstom Haliade

Alstom has signed a contract with CPFL Renováveis, to deliver, erect and commission 19 ECO 122 wind turbines in the wind complex Pedra Cheirosa, located in Ceará State, in the northeast of Brazil.

The contract was signed in the framework of the last A-5 auction system in Brazil, which is related to projects that have to operate in the coming 5 years. The wind turbines will be ready for the commercial operation in December of 2017.

Content Dam Pennenergy Online Articles 2014 05 Alstom Haliade

This is the first wind power project of Alstom with CPFL Renováveis. The wind farms will generate 50 MW, an amount that can bring energy to around 100.000 people. The ECO 122 wind turbines will be produced at Alstom manufacturing unit in Camaçari (Bahia State).

ECO 122 is the latest evolution of Alstom’s ECO 100 and the result of more than 30 years of experience in wind turbine design. All Alstom wind turbines are based upon the Alstom Pure Torque rotor support concept that protects the drive train from deflection loads, ensuring higher reliability and lower maintenance costs.

More in Tools & Supplies